GL’s Car Chargers offer Part-S solution for Developers

gl ev 1

With the introduction of Part S Building Regulations, EV chargers will become standard within the housebuilder specification. GL’s EVIQ 7.3kW charging point offers a solution for developers as it meets all Part-S requirements including the Smart Charging Regulations coming into effect June 2022.

GL’s EVIQ car charger is site ready and can be installed by the developer’s existing electrical sub-contractors. The sleek design is an all-in-one box solution as it contains an inbuilt 40 amp RCBO, negating the need for an additional garo box and has a built in PME fault detection, meaning no earth spike or additional equipment is required. A free CT clamp is included and the socket is an untethered, universal socket.

Homeowners benefit from a future-proof, smart system featuring dynamic load management, intelligent power adjustment, emergency stop, WIFI or ethernet monitoring and a LED charging status indicator. A free app allows users to manage timers, create charging records, and control security.

GL have been supplying lighting, safety alarms, and electrical equipment to the housebuilding industry for over 20 years. GL have a proven track record of supply, reliability, and an established route to market and have dedicated, ringfenced stock of EVIQ for developers.

Anthony Ottway, Managing Director of GL commented “Having worked in the industry for over two decades, we are delighted to offer a one-box EV charger solution. We are excited to be part of this next phase in the evolution of home car chargers”.

GL-e logo

GL (Green Lighting)

Unit 18, Great Western Business Park
McKenzie Way
Worcester
UK

01905 610200